ADU Project Coordination Across the West

An accessory dwelling unit can support rental income, multigenerational living, or added property value. Homeland coordinates feasibility, home selection, permit professionals, licensed site contractors, delivery or installation partners, inspections, and closeout.

What We Handle

ADU project coordination
accessory dwelling units
backyard home dealer
detached ADU project delivery
garage conversion ADU
prefab ADU installation
granny flat construction

Our ADU Project Coordination Process

1

Feasibility & Lot Review

We review your parcel, zoning, setbacks, and utility access to confirm what size and type of ADU your lot supports.

2

Design & Model Selection

Choose from our pre-engineered ADU models or a semi-custom design, then select finishes and floor plan options.

3

Permitting

Our team prepares and submits the full permit package and manages plan-check corrections with your local building department.

4

Site Preparation

Grading, foundation, and utility connections (water, sewer, electrical) are completed by licensed contractors we coordinate.

5

Construction & Installation

Your ADU is built — on-site or factory-built and set — with scheduled inspections at every milestone.

6

Final Inspection & Move-In

We coordinate final inspections, certificate of occupancy, and hand over a rent-ready or move-in-ready unit.

Accessory Dwelling Units, Start to Finish

Homeland provides dealer-led project coordination for accessory dwelling units across California, Oregon, Washington, Nevada, Arizona, and Idaho. We coordinate feasibility, structural engineering, energy compliance, permitting, licensed site contractors, delivery or installation partners, and closeout as one point of contact. We are a licensed modular dealer, and we are independent of any single factory, so the unit we recommend is based on your lot and local code.

State ADU Law Across the West

California's statewide ADU statutes are the most permissive in the country: ministerial approval within a fixed review window, no owner-occupancy requirement on most units, limits on impact fees for smaller units, and restrictions on the parking and setback conditions a city may impose. Oregon and Washington have adopted their own middle-housing legislation opening accessory dwelling units in single-family zones. Arizona, Nevada, and Idaho are governed more locally, so the controlling rules come from the county or municipal code. Which framework applies to your parcel is settled during feasibility, before any design work begins.

Permits, Plan Check and Inspections

An ADU permit application is reviewed against zoning, setbacks, lot coverage, height, fire separation, utility capacity, and parking, then moves through plan check and a fixed inspection sequence from foundation to final. Homeland and its permit partners coordinate the submittal package, plan-check corrections, and inspection pathway through certificate of occupancy, incorporating known local requirements before the first submittal.

Detached, Attached, Garage Conversion and Junior ADUs

Detached accessory dwelling units are standalone structures on the same lot. Attached units share a wall with the primary residence. Garage conversion ADUs reuse an existing permitted footprint. Junior ADUs are created within the existing house and have distinct size, kitchen, and access requirements. Homeland coordinates these regulated project types with permit professionals and licensed contractors.

Recent ADU Projects

Photos from Homeland job sites — foundations, module sets, and finished homes built by the same crews who will handle your project in California, Oregon, Washington, Nevada & Arizona.

Crane Setting Modular Unit
Modern Modular Exterior
Concrete Slab Pour
Single-Story Modular Home
Newly Installed Kitchen
Aerial Site Progress
See projects from our builder network

ADU Project Coordination — Frequently Asked Questions

How much does it cost to build an ADU in California, Oregon, Washington, Nevada & Arizona?

Most ADU projects in California, Oregon, Washington, Nevada & Arizona land between $150,000 and $400,000 depending on size, whether it is detached or a garage conversion, site conditions, and finish level. Factory-built ADUs typically cost 10–25% less than fully site-built units because the structure is assembled in a controlled environment. The biggest cost variables are utility trenching distance, foundation requirements on sloped lots, and local impact fees. Homeland provides a line-item estimate after a free lot review, so you know the true all-in number — not just the base structure price.

Do I need a permit to build an ADU in California, Oregon, Washington, Nevada & Arizona?

Yes. Every ADU requires a building permit, and most jurisdictions also require separate electrical, plumbing, and mechanical permits. The good news: state law across California, Oregon, and Washington now requires cities to allow ADUs on most single-family lots and to approve compliant applications within set timelines (60 days in California). Homeland prepares the complete permit package, submits it, and handles all plan-check corrections, so you never have to visit the counter yourself.

How long does an ADU project take from start to finish in California, Oregon, Washington, Nevada & Arizona?

Plan on 6–12 months total. Design and permitting usually take 2–4 months depending on how busy the local building department is. Construction takes 4–6 months for site-built units, or as little as 8–12 weeks for factory-built ADUs since site work and factory fabrication happen simultaneously. Weather, inspection scheduling, and utility company lead times are the most common delay sources, so those allowances are included in the schedule from the start.

Can I rent out my ADU in California, Oregon, Washington, Nevada & Arizona?

In nearly all cases, yes — long-term rentals (30+ days) of permitted ADUs are allowed throughout California, Oregon, and Washington. Short-term rentals (Airbnb-style) are regulated locally and are restricted or banned for ADUs in many cities, so check your specific municipality before planning around nightly rates. A legal, permitted ADU in a strong rental market typically generates $1,500–$3,500/month, and lenders increasingly count that projected income when qualifying you for construction financing.

What size ADU can I build on my lot?

State law in California guarantees the right to build at least an 800 sq ft ADU on most single-family lots regardless of local lot-coverage rules, and detached ADUs up to 1,200 sq ft are common where lot size allows. Oregon and Washington have similar allowances that vary by city. Practical size is determined by setbacks (typically 4 feet from side and rear lines), existing structures, and utility locations. During our free feasibility review we overlay these rules on your actual parcel and tell you the maximum buildable envelope.

What happens if my ADU plans get rejected or corrections are required?

Plan-check corrections are normal — most first submittals receive at least one correction letter covering items like energy calculations, fire-separation details, or drainage plans. Because Homeland and its permit partners coordinate plan sets across West Coast jurisdictions, packages are prepared to each city's known requirements, which keeps correction cycles short. If corrections are issued, our design team responds directly to the plan checker, usually within days, at no additional cost to you. Outright rejections are rare for code-compliant ADU applications since state laws limit the grounds on which cities can deny them.

Should I choose a site-built or factory-built ADU?

Factory-built (modular or manufactured) ADUs win on speed and price predictability: the unit is built indoors while your foundation and utilities are prepared, cutting total construction time roughly in half and eliminating weather delays. Site-built ADUs win on design flexibility — irregular lots, hillside foundations, or fully custom layouts. For flat, accessible lots, we usually recommend factory-built; for tight urban infill or sloped parcels, site-built often pencils better. Homeland coordinates both pathways, so our recommendation is based on your lot rather than a single product line.

Ready to build in California, Oregon, Washington, Nevada & Arizona?

Free consultation — one team from land to move-in. Serving California, Oregon, Washington, Nevada & Arizona and the entire West Coast.

ADU Project Coordination by Location

California

Oregon

Washington

Arizona